Before I built a single screen of the IT Asset Disposal app at SLB, I drew the whole thing out. Who does what, which emails go where, what gets saved, and how the data fits together. It ended up as one draw.io file with nine pages, kept in the order I made them. This note walks through how they changed.

What we were actually disposing of

Disposal sounds abstract until you see it: switches, access points, chargers and hard drives piling up in a storeroom, waiting for two approvals that lived in an email thread.

Boxes of old IT equipment on a warehouse floor
Old desktops and boxes stacked in a storeroom
A box of removed hard drives

Each laptop has its own asset tag and serial number. A cable lock doesn't; you just count them. That one difference shaped the whole data model later on.

1. The first flow: four lanes and one "third party"

The first version came over from LucidChart. It had four lanes: the requestor, the system, an admin, and a single "third party" approver. The whole approval was one cycle, repeated for the Finance Controller. The notes in the margin are me reminding myself to focus on manual input first.

The first swimlane flowchart with Requestor, System, Admin and Third Party lanes
Page 2, the MVP flow. Asset or non-asset is already the first big decision.

2. Giving everyone their own lane

The single "third party" was really two different people with two different jobs. The IT Manager and the Finance Controller got their own lanes, every email was spelled out with who gets it as TO and who as CC, and a home page appeared with Create, View My Requests and Help.

A five-lane flowchart with a home page, IT Manager and Finance Controller lanes and an admin lane
Page 5. The dotted lines split it into stages: submit, IT Manager, Finance Controller, then the QUEST and IBase numbers.

3. The final flow, and admin on its own

The final version pulled the admin work out into its own chart. Admins can view, add, edit and remove four things: other admins, locations, requestors and approvers. The main flow also got a "Confirm submission" step, warning that the list can't change once it's submitted.

The final four-lane flowchart from request to disposal
Page 7, the final flow.
The admin flowchart: view, add, edit and delete admins, locations, requestors and approvers
Page 7, admin access.

4. From a ten-table ERD to five lists

The team's first ERD tried to model everything: users, requests, approvals, dismantling, documents, certificates and reports. It was a good map of the whole disposal process, but most of it wasn't the app's job.

A wide ERD with User, Location, Disposal Request, Approval, Asset, Non-Asset, Dismantling, Document, Certificate and Report tables
Page 6, the team draft. The pink tables (dismantling, documents, certificates, reports) never made it into the app.

I cut it down and normalised it to third normal form: each fact stored once, and tables pointing at each other by ID.

The normalised ERD with Approver, Case, Requestor, Location and Item
Page 8, normalised: Case, Requestor, Location, Item and Approver.

5. The data model that shipped

Building it in SharePoint lists changed it one more time. This is what the app actually runs on.

Final data model of the IT Asset Disposal appFive SharePoint lists. A location has many cases; a case contains many items, is shared with many watchlist entries, and can have one QUEST and one IBase number. Items are picked from the IT asset list.1Napprovers come from1Ncontains1Nshared with1Nitems picked from0..11risk report0..1manpowerLOCATIONLocationIDPKNameCountryFirstApproverNameFirstApproverEmailSecondApproverNameSecondApproverEmailCASEIDPKLocationIDFKLocationrequestorNameRequestorEmailFirstApproverNamecopiedFirstApproverEmailcopiedSecondApproverNamecopiedSecondApproverEmailcopiedStatusYearUIDITEMIDPKcaseNoFKassetTypeAsset / Non AssetItemsassetBrandassetModelSerialNumAssetTagQuantityUIDWATCHLISTIDPKcaseIDFKWatchlistNameWatchlistEmailAddedByUIDIT ASSET LISTIDPKAssetTypeItemTypeManufacturerModelQUEST NUMBERcaseNoFKrisk report no.IBASE NUMBERcaseNoFKmanpower request no.
Swipe sideways to see the whole diagram.

One thing in there looks like it breaks the rules: the approvers' names and emails are copied from the location onto each case. That's on purpose. If a base gets a new IT Manager next month, the cases already waiting keep the approver they were submitted to, instead of suddenly landing on someone who's never seen them.

ListWhat it holds
CaseOne row per disposal case: base, requestor, both approvers and status
ItemEach item in a case. Assets have a tag and serial number; non-assets have a quantity
LocationEach base, with its 1st and 2nd level approvers
WatchlistColleagues added to a case so they can view, edit or submit it
IT Asset ListThe catalogue of device types, brands and models behind the dropdowns

What never made it

Two ideas sit in every version of the charts: scanning a barcode to pull an asset's details from the internal asset system, and marking it as disposed in the hardware ESM afterwards. Both needed access to SLB systems outside an intern project's scope, so items were typed in by hand. If anyone picks the app up again, that's where I'd start.

A worker in orange coveralls breaking hard drives with a hammer, face blurred
And at the very end of the flow: hard drives, by hammer.

The draw.io file, the data model and sample data are all in the repo's docs.

26 screens · about 2 minutesSee how the charts turned outClick through one disposal case from draft to disposed.
← From reply-all to Power Apps Rebuilding my FYP properly →